StructuralT2 2026
Footscray Pedestrian Overpass
Final conceptual design of the steel deck framing, lift support frames and pad footings for an 82 m covered footbridge over a live railway. Every member was checked to AS 4100 by hand, then verified in SPACE GASS.
- Continuous girder, 4 × 20.5 m spans
- 82 m
- Continuous girder, 4 × 20.5 m spans
- Peak member utilisation
- 0.91
- Peak member utilisation
- Hand calc vs SPACE GASS
- ≤ 0.15%
- Hand calc vs SPACE GASS














